Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

EMP-EOIT/NGPL REC BRYAN

Natural Gas Pipeline (NGPL) · Loc 906507 · Oklahoma
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.017
Bcf/d scheduled
Δ Day-over-day
+0.013
vs Nov 25
7-day average
0.028
Bcf/d
30-day average
0.028
30 of 30 days posted
30-day high
0.072
Nov 9
30-day low
0.000
Oct 31
Operating capacity
0.460
Bcf/d as posted, evening cycle
Utilization
4%
headroom 96%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.0600.080Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.017+0.013
Nov 250.004-0.050
Nov 240.054+0.053
Nov 230.001-0.031
Nov 220.032-0.015
Nov 210.047+0.008
Nov 200.039+0.020
Nov 190.019-0.044
Nov 180.063-0.004
Nov 170.066+0.005
Nov 160.061+0.056
Nov 150.005-0.056
Nov 140.061+0.020
Nov 130.041+0.014
Nov 120.027+0.000
Nov 110.027+0.003
Nov 100.024-0.049
Nov 90.072+0.038
Nov 80.034+0.000
Nov 70.034+0.010
Nov 60.024+0.009
Nov 50.015+0.001
Nov 40.013+0.001
Nov 30.012-0.017
Nov 20.029+0.016
Nov 10.014+0.013
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000+0.000
Oct 280.000—
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Oklahoma) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, EMP-EOIT/NGPL REC BRYAN (Natural Gas Pipeline (NGPL) loc 906507) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/906507/