Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

MIDCOAST/NGPL #2 PANOLA

Natural Gas Pipeline (NGPL) · Loc 41589 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.157
Bcf/d scheduled
Δ Day-over-day
-0.016
vs Nov 25
7-day average
0.111
Bcf/d
30-day average
0.114
30 of 30 days posted
30-day high
0.234
Nov 10
30-day low
0.019
Nov 20
Operating capacity
0.500
Bcf/d as posted, evening cycle
Utilization
31%
headroom 69%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.157-0.016
Nov 250.172-0.034
Nov 240.207+0.148
Nov 230.059-0.041
Nov 220.100+0.038
Nov 210.062+0.042
Nov 200.019-0.020
Nov 190.039-0.093
Nov 180.132+0.010
Nov 170.122+0.030
Nov 160.092-0.000
Nov 150.093-0.000
Nov 140.093-0.001
Nov 130.094-0.019
Nov 120.113-0.008
Nov 110.120-0.113
Nov 100.234+0.129
Nov 90.104+0.015
Nov 80.090-0.014
Nov 70.104-0.026
Nov 60.130+0.041
Nov 50.089+0.032
Nov 40.057-0.069
Nov 30.127-0.080
Nov 20.207+0.002
Nov 10.205+0.137
Oct 310.068-0.015
Oct 300.083-0.029
Oct 290.112-0.038
Oct 280.150—
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MIDCOAST/NGPL #2 PANOLA (Natural Gas Pipeline (NGPL) loc 41589) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/41589/