Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

TARGAND/NGPL ROJO TORO LEA

Natural Gas Pipeline (NGPL) · Loc 50169 · New Mexico
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
0.467
Bcf/d scheduled
Δ Day-over-day
-0.002
vs Nov 26
7-day average
0.462
Bcf/d
30-day average
0.383
30 of 30 days posted
30-day high
0.493
Oct 31
30-day low
0.000
Nov 13
Operating capacity
0.602
Bcf/d as posted, evening cycle
Utilization
78%
headroom 22%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.60Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.467-0.002
Nov 260.469+0.015
Nov 250.454-0.010
Nov 240.463+0.015
Nov 230.448-0.015
Nov 220.463-0.005
Nov 210.468+0.019
Nov 200.449+0.002
Nov 190.447+0.001
Nov 180.446+0.013
Nov 170.433+0.016
Nov 160.417+0.000
Nov 150.417-0.001
Nov 140.417+0.417
Nov 130.000+0.000
Nov 120.000+0.000
Nov 110.000+0.000
Nov 100.000-0.431
Nov 90.431+0.000
Nov 80.431+0.000
Nov 70.430+0.014
Nov 60.416+0.010
Nov 50.406-0.026
Nov 40.432+0.044
Nov 30.388-0.020
Nov 20.408+0.001
Nov 10.407-0.086
Oct 310.493+0.000
Oct 300.493+0.001
Oct 290.492—
86 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (New Mexico) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Natural Gas Pipeline (NGPL) · posted 2026-11-05 · effective 2026-11-05 · informational
Natural Gas Pipeline (NGPL) · posted 2026-10-28 · effective 2026-10-28 · informational
Natural Gas Pipeline (NGPL) · posted 2026-10-28 · effective 2026-10-28 · informational
Natural Gas Pipeline (NGPL) · posted 2026-10-20 · effective 2026-10-20 · informational
Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TARGAND/NGPL ROJO TORO LEA (Natural Gas Pipeline (NGPL) loc 50169) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/50169/