BTA ETG/NGPL EAST TEXAS GATHERING N

Natural Gas Pipeline (NGPL) · Loc 45310 · Texas
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.228
Bcf/d scheduled
Δ Day-over-day
-0.005
vs Nov 25
7-day average
0.222
Bcf/d
30-day average
0.230
30 of 30 days posted
30-day high
0.249
Nov 16
30-day low
0.199
Nov 19
Operating capacity
0.500
Bcf/d as posted, evening cycle
Utilization
46%
headroom 54%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.228-0.005
Nov 250.234+0.005
Nov 240.229+0.011
Nov 230.218+0.000
Nov 220.218-0.000
Nov 210.218+0.006
Nov 200.212+0.013
Nov 190.199-0.050
Nov 180.249+0.002
Nov 170.246-0.003
Nov 160.249+0.001
Nov 150.249-0.001
Nov 140.249+0.048
Nov 130.202-0.030
Nov 120.231+0.006
Nov 110.226+0.007
Nov 100.219-0.012
Nov 90.231+0.002
Nov 80.229-0.001
Nov 70.230+0.000
Nov 60.230+0.004
Nov 50.226-0.013
Nov 40.239-0.004
Nov 30.243+0.007
Nov 20.237+0.001
Nov 10.236+0.009
Oct 310.226+0.000
Oct 300.226-0.003
Oct 290.229-0.005
Oct 280.234—
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BTA ETG/NGPL EAST TEXAS GATHERING N (Natural Gas Pipeline (NGPL) loc 45310) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/45310/