Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

TGG / NGPL NACOGDOCHES

Natural Gas Pipeline (NGPL) · Loc 46389 · Texas
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.137
Bcf/d scheduled
Δ Day-over-day
+0.009
vs Nov 25
7-day average
0.134
Bcf/d
30-day average
0.129
30 of 30 days posted
30-day high
0.145
Nov 22
30-day low
0.113
Nov 18
Operating capacity
0.500
Bcf/d as posted, evening cycle
Utilization
27%
headroom 73%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.137+0.009
Nov 250.128+0.002
Nov 240.126-0.009
Nov 230.135-0.010
Nov 220.145+0.000
Nov 210.145+0.024
Nov 200.121+0.002
Nov 190.119+0.007
Nov 180.113-0.004
Nov 170.117-0.021
Nov 160.137+0.001
Nov 150.137-0.001
Nov 140.137+0.015
Nov 130.122+0.006
Nov 120.116+0.000
Nov 110.116-0.009
Nov 100.125-0.000
Nov 90.125-0.000
Nov 80.125+0.000
Nov 70.125+0.004
Nov 60.121+0.000
Nov 50.121-0.009
Nov 40.130-0.000
Nov 30.131+0.010
Nov 20.121+0.005
Nov 10.116-0.028
Oct 310.143+0.000
Oct 300.143+0.002
Oct 290.141+0.000
Oct 280.141—
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TGG / NGPL NACOGDOCHES (Natural Gas Pipeline (NGPL) loc 46389) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/46389/