Gas day Nov 27
-0.286
Bcf/d scheduled
Δ Day-over-day
-0.005
vs Nov 26
7-day average
-0.335
Bcf/d
30-day average
-0.320
30 of 30 days posted
30-day high
-0.213
Nov 20
30-day low
-0.429
Nov 24
Operating capacity
0.500
Bcf/d as posted, evening cycle
Utilization
57%
headroom 43%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.60-0.40-0.20-0.00Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.286-0.005
Nov 26-0.281+0.033
Nov 25-0.314+0.116
Nov 24-0.429-0.088
Nov 23-0.341+0.021
Nov 22-0.362-0.029
Nov 21-0.333-0.120
Nov 20-0.213+0.058
Nov 19-0.271+0.117
Nov 18-0.388+0.006
Nov 17-0.394-0.019
Nov 16-0.375+0.000
Nov 15-0.375-0.096
Nov 14-0.279-0.013
Nov 13-0.267+0.065
Nov 12-0.332-0.006
Nov 11-0.326+0.052
Nov 10-0.378-0.032
Nov 9-0.346-0.041
Nov 8-0.304-0.003
Nov 7-0.302-0.006
Nov 6-0.296-0.054
Nov 5-0.242-0.025
Nov 4-0.217+0.085
Nov 3-0.302-0.027
Nov 2-0.275-0.056
Nov 1-0.219+0.151
Oct 31-0.370+0.010
Oct 30-0.380+0.025
Oct 29-0.405—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.