Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

MATTEXPR/NGPL BERNARD CREEK RECEIPT

Natural Gas Pipeline (NGPL) · Loc 56007 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.462
Bcf/d scheduled
Δ Day-over-day
-0.075
vs Nov 25
7-day average
0.489
Bcf/d
30-day average
0.472
30 of 30 days posted
30-day high
0.573
Nov 3
30-day low
0.404
Oct 29
Operating capacity
0.719
Bcf/d as posted, evening cycle
Utilization
64%
headroom 36%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.60Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.462-0.075
Nov 250.537+0.028
Nov 240.509+0.022
Nov 230.487-0.004
Nov 220.491-0.004
Nov 210.494+0.050
Nov 200.445+0.019
Nov 190.426+0.012
Nov 180.414-0.034
Nov 170.448-0.050
Nov 160.497+0.016
Nov 150.482+0.009
Nov 140.473-0.070
Nov 130.543+0.106
Nov 120.437+0.010
Nov 110.427-0.062
Nov 100.489+0.015
Nov 90.474-0.011
Nov 80.485+0.013
Nov 70.472-0.067
Nov 60.539+0.075
Nov 50.464-0.066
Nov 40.530-0.042
Nov 30.573+0.140
Nov 20.433+0.026
Nov 10.407-0.016
Oct 310.423+0.006
Oct 300.416+0.013
Oct 290.404-0.089
Oct 280.493—
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MATTEXPR/NGPL BERNARD CREEK RECEIPT (Natural Gas Pipeline (NGPL) loc 56007) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/56007/