Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

TARGA MC/NGPL ENVILLE PLT LOVE

Natural Gas Pipeline (NGPL) · Loc 905317 · Oklahoma
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
-0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
-0.000
Bcf/d
30-day average
-0.000
30 of 30 days posted
30-day high
-0.000
Nov 27
30-day low
-0.000
Nov 27
Operating capacity
0.008
Bcf/d as posted, evening cycle
Utilization
4%
headroom 96%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.000-0.000-0.000-0.000Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.000+0.000
Nov 26-0.000+0.000
Nov 25-0.000+0.000
Nov 24-0.000+0.000
Nov 23-0.000+0.000
Nov 22-0.000+0.000
Nov 21-0.000+0.000
Nov 20-0.000+0.000
Nov 19-0.000+0.000
Nov 18-0.000+0.000
Nov 17-0.000+0.000
Nov 16-0.000+0.000
Nov 15-0.000+0.000
Nov 14-0.000+0.000
Nov 13-0.000+0.000
Nov 12-0.000+0.000
Nov 11-0.000+0.000
Nov 10-0.000+0.000
Nov 9-0.000+0.000
Nov 8-0.000+0.000
Nov 7-0.000+0.000
Nov 6-0.000+0.000
Nov 5-0.000+0.000
Nov 4-0.000+0.000
Nov 3-0.000+0.000
Nov 2-0.000+0.000
Nov 1-0.000+0.000
Oct 31-0.000+0.000
Oct 30-0.000+0.000
Oct 29-0.000—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Oklahoma) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TARGA MC/NGPL ENVILLE PLT LOVE (Natural Gas Pipeline (NGPL) loc 905317) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/905317/