Gas day Nov 26
0.032
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.033
Bcf/d
30-day average
0.035
30 of 30 days posted
30-day high
0.040
Nov 6
30-day low
0.032
Nov 26
Operating capacity
0.067
Bcf/d as posted, evening cycle
Utilization
48%
headroom 52%
Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.032 | -0.001 |
| Nov 25 | 0.033 | +0.000 |
| Nov 24 | 0.033 | +0.000 |
| Nov 23 | 0.033 | +0.000 |
| Nov 22 | 0.033 | +0.000 |
| Nov 21 | 0.033 | +0.000 |
| Nov 20 | 0.033 | -0.002 |
| Nov 19 | 0.035 | +0.000 |
| Nov 18 | 0.035 | +0.000 |
| Nov 17 | 0.035 | +0.002 |
| Nov 16 | 0.033 | +0.000 |
| Nov 15 | 0.033 | +0.000 |
| Nov 14 | 0.033 | -0.003 |
| Nov 13 | 0.035 | +0.001 |
| Nov 12 | 0.035 | +0.000 |
| Nov 11 | 0.035 | +0.000 |
| Nov 10 | 0.035 | +0.000 |
| Nov 9 | 0.035 | +0.000 |
| Nov 8 | 0.035 | +0.000 |
| Nov 7 | 0.035 | -0.005 |
| Nov 6 | 0.040 | +0.000 |
| Nov 5 | 0.040 | +0.000 |
| Nov 4 | 0.039 | -0.000 |
| Nov 3 | 0.040 | +0.000 |
| Nov 2 | 0.040 | +0.000 |
| Nov 1 | 0.040 | +0.004 |
| Oct 31 | 0.035 | +0.000 |
| Oct 30 | 0.035 | +0.000 |
| Oct 29 | 0.035 | +0.000 |
| Oct 28 | 0.035 | — |
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Natural Gas Pipeline (NGPL)State only (Oklahoma) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on Natural Gas Pipeline (NGPL)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →
Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Natural Gas Pipeline (NGPL)
- HPL/NGPL PANOLA 0.524 Bcf/d
- TARGAND/NGPL ROJO TORO LEA 0.468 Bcf/d
- MATTEXPR/NGPL BERNARD CREEK RECEIPT 0.462 Bcf/d
- KMNTP / NGPL DELIVERY LAMAR -0.250 Bcf/d
- BTA ETG/NGPL EAST TEXAS GATHERING N 0.228 Bcf/d
- MIDCOAST/NGPL #2 PANOLA 0.157 Bcf/d
- ALIGN/NGPL ANGELINA 0.143 Bcf/d
- TGG / NGPL NACOGDOCHES 0.137 Bcf/d
Cite thisEnercast PipeScrape, DCP OPER/NGPL CHITWOOD PLT GRADY (Natural Gas Pipeline (NGPL) loc 901458) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/901458/