Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

GCX/NGPL AGUA DULCE GCXE RECEIPT NU

Natural Gas Pipeline (NGPL) · Loc 57669 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
0.030
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.030
Bcf/d
30-day average
0.041
30 of 30 days posted
30-day high
0.172
Oct 29
30-day low
0.013
Nov 3
Operating capacity
0.254
Bcf/d as posted, evening cycle
Utilization
12%
headroom 88%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.030+0.000
Nov 260.030+0.000
Nov 250.030+0.000
Nov 240.030+0.000
Nov 230.030+0.000
Nov 220.030+0.000
Nov 210.030+0.000
Nov 200.030+0.007
Nov 190.023-0.007
Nov 180.030+0.000
Nov 170.030+0.000
Nov 160.030+0.000
Nov 150.030+0.000
Nov 140.030+0.000
Nov 130.030+0.000
Nov 120.030-0.010
Nov 110.040+0.005
Nov 100.035+0.013
Nov 90.022-0.012
Nov 80.033-0.001
Nov 70.034-0.000
Nov 60.035-0.001
Nov 50.035+0.020
Nov 40.015+0.002
Nov 30.013-0.017
Nov 20.030+0.000
Nov 10.030-0.109
Oct 310.139-0.000
Oct 300.139-0.033
Oct 290.172—
86 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, GCX/NGPL AGUA DULCE GCXE RECEIPT NU (Natural Gas Pipeline (NGPL) loc 57669) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/57669/