Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

DPNMLLC/NGPL ANTHONY ROAD DEL LEA

Natural Gas Pipeline (NGPL) · Loc 56987 · New Mexico
Gathering receipt · counted in Supply / Production
Gas day Nov 26
-0.004
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
-0.004
Bcf/d
30-day average
-0.003
30 of 30 days posted
30-day high
-0.000
Nov 13
30-day low
-0.004
Nov 26
Operating capacity
0.008
Bcf/d as posted, evening cycle
Utilization
43%
headroom 57%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.004-0.003-0.002-0.0010.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.004+0.000
Nov 25-0.004+0.000
Nov 24-0.004+0.000
Nov 23-0.004+0.000
Nov 22-0.004+0.000
Nov 21-0.004+0.000
Nov 20-0.004+0.000
Nov 19-0.004+0.000
Nov 18-0.004+0.000
Nov 17-0.004+0.000
Nov 16-0.004+0.000
Nov 15-0.004+0.000
Nov 14-0.004-0.004
Nov 13-0.000+0.000
Nov 12-0.000+0.000
Nov 11-0.000+0.000
Nov 10-0.000+0.004
Nov 9-0.004+0.000
Nov 8-0.004+0.000
Nov 7-0.004+0.000
Nov 6-0.004+0.000
Nov 5-0.004+0.000
Nov 4-0.004+0.000
Nov 3-0.004+0.000
Nov 2-0.004+0.000
Nov 1-0.004+0.000
Oct 31-0.004+0.000
Oct 30-0.004+0.000
Oct 29-0.004+0.000
Oct 28-0.004—
84 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (New Mexico) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Natural Gas Pipeline (NGPL) · posted 2026-11-05 · effective 2026-11-05 · informational
Natural Gas Pipeline (NGPL) · posted 2026-10-28 · effective 2026-10-28 · informational
Natural Gas Pipeline (NGPL) · posted 2026-10-28 · effective 2026-10-28 · informational
Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, DPNMLLC/NGPL ANTHONY ROAD DEL LEA (Natural Gas Pipeline (NGPL) loc 56987) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/56987/