Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

NGPL/KMTEJAS FM 1161 PHPE WHARTON

Natural Gas Pipeline (NGPL) · Loc 56394 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
0.084
Bcf/d scheduled
Δ Day-over-day
+0.013
vs Nov 26
7-day average
0.104
Bcf/d
30-day average
0.076
30 of 30 days posted
30-day high
0.159
Nov 19
30-day low
0.000
Nov 2
Operating capacity
0.250
Bcf/d as posted, evening cycle
Utilization
34%
headroom 66%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.084+0.013
Nov 260.071-0.029
Nov 250.100+0.034
Nov 240.067-0.069
Nov 230.135+0.000
Nov 220.135+0.000
Nov 210.135+0.003
Nov 200.132-0.026
Nov 190.159+0.132
Nov 180.027-0.052
Nov 170.079-0.008
Nov 160.088+0.017
Nov 150.071+0.000
Nov 140.071-0.041
Nov 130.112+0.011
Nov 120.101+0.015
Nov 110.086+0.052
Nov 100.035-0.024
Nov 90.059+0.000
Nov 80.059+0.000
Nov 70.059-0.005
Nov 60.063-0.066
Nov 50.130+0.056
Nov 40.073+0.019
Nov 30.054+0.054
Nov 20.000-0.000
Nov 10.000+0.000
Oct 310.000-0.009
Oct 300.009-0.079
Oct 290.088—
86 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NGPL/KMTEJAS FM 1161 PHPE WHARTON (Natural Gas Pipeline (NGPL) loc 56394) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/56394/