MARKWEST/NGPL PANOLA #2 RECEIPT PAN

Natural Gas Pipeline (NGPL) · Loc 56034 · Texas
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.045
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 26
7-day average
0.051
Bcf/d
30-day average
0.048
30 of 30 days posted
30-day high
0.097
Nov 24
30-day low
0.028
Nov 5
Operating capacity
0.297
Bcf/d as posted, evening cycle
Utilization
15%
headroom 85%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.045-0.001
Nov 260.045+0.000
Nov 250.045-0.052
Nov 240.097+0.053
Nov 230.044+0.003
Nov 220.040-0.001
Nov 210.041+0.001
Nov 200.040-0.045
Nov 190.085+0.054
Nov 180.030-0.062
Nov 170.092+0.054
Nov 160.038-0.000
Nov 150.038-0.000
Nov 140.038+0.003
Nov 130.035-0.002
Nov 120.037-0.000
Nov 110.037-0.038
Nov 100.076+0.036
Nov 90.040+0.000
Nov 80.040+0.000
Nov 70.040-0.007
Nov 60.046+0.018
Nov 50.028-0.015
Nov 40.043-0.029
Nov 30.072+0.033
Nov 20.039+0.001
Nov 10.038-0.009
Oct 310.048+0.000
Oct 300.048+0.003
Oct 290.045—
86 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MARKWEST/NGPL PANOLA #2 RECEIPT PAN (Natural Gas Pipeline (NGPL) loc 56034) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/56034/