Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

KMTP/NGPL GOODRICH POLK

Natural Gas Pipeline (NGPL) · Loc 5579 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
-0.133
Bcf/d scheduled
Δ Day-over-day
+0.003
vs Nov 26
7-day average
-0.150
Bcf/d
30-day average
-0.175
30 of 30 days posted
30-day high
-0.126
Nov 25
30-day low
-0.246
Nov 12
Operating capacity
0.262
Bcf/d as posted, evening cycle
Utilization
51%
headroom 49%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.30-0.20-0.10-0.00Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.133+0.003
Nov 26-0.136-0.010
Nov 25-0.126+0.015
Nov 24-0.141+0.044
Nov 23-0.184+0.001
Nov 22-0.185-0.039
Nov 21-0.146+0.000
Nov 20-0.146+0.000
Nov 19-0.146+0.055
Nov 18-0.201-0.032
Nov 17-0.169-0.000
Nov 16-0.169+0.000
Nov 15-0.169+0.030
Nov 14-0.199+0.027
Nov 13-0.225+0.021
Nov 12-0.246-0.000
Nov 11-0.246-0.020
Nov 10-0.226-0.031
Nov 9-0.195-0.015
Nov 8-0.180+0.015
Nov 7-0.195-0.013
Nov 6-0.182+0.041
Nov 5-0.223-0.035
Nov 4-0.188-0.050
Nov 3-0.138-0.010
Nov 2-0.128-0.000
Nov 1-0.128+0.038
Oct 31-0.166-0.004
Oct 30-0.162+0.020
Oct 29-0.182—
86 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, KMTP/NGPL GOODRICH POLK (Natural Gas Pipeline (NGPL) loc 5579) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/5579/