Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

AGUABLAN/NGPL LOCKRIDGE WAHA PECOS

Natural Gas Pipeline (NGPL) · Loc 54796 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.032
Bcf/d scheduled
Δ Day-over-day
-0.014
vs Nov 25
7-day average
0.022
Bcf/d
30-day average
0.076
30 of 30 days posted
30-day high
0.194
Nov 11
30-day low
0.000
Nov 21
Operating capacity
0.200
Bcf/d as posted, evening cycle
Utilization
16%
headroom 84%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.032-0.014
Nov 250.046+0.006
Nov 240.040+0.013
Nov 230.027+0.021
Nov 220.007+0.007
Nov 210.000+0.000
Nov 200.000+0.000
Nov 190.000-0.001
Nov 180.001-0.032
Nov 170.033-0.049
Nov 160.082+0.021
Nov 150.061+0.012
Nov 140.049-0.138
Nov 130.186+0.006
Nov 120.181-0.013
Nov 110.194+0.001
Nov 100.193+0.118
Nov 90.075+0.016
Nov 80.060-0.005
Nov 70.065-0.015
Nov 60.080-0.003
Nov 50.083+0.011
Nov 40.072-0.049
Nov 30.121+0.011
Nov 20.110-0.016
Nov 10.126+0.033
Oct 310.093+0.000
Oct 300.093+0.006
Oct 290.087-0.001
Oct 280.088—
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Natural Gas Pipeline (NGPL) · posted 2026-11-05 · effective 2026-11-05 · informational
Natural Gas Pipeline (NGPL) · posted 2026-10-28 · effective 2026-10-28 · informational
Natural Gas Pipeline (NGPL) · posted 2026-10-28 · effective 2026-10-28 · informational
Natural Gas Pipeline (NGPL) · posted 2026-10-20 · effective 2026-10-20 · informational
Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, AGUABLAN/NGPL LOCKRIDGE WAHA PECOS (Natural Gas Pipeline (NGPL) loc 54796) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/54796/