Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

ONEOKFS/NGPL CUS

Natural Gas Pipeline (NGPL) · Loc 5388 · Oklahoma
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.032
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.032
Bcf/d
30-day average
0.025
30 of 30 days posted
30-day high
0.035
Nov 13
30-day low
0.000
Nov 6
Operating capacity
0.174
Bcf/d as posted, evening cycle
Utilization
18%
headroom 82%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0100.0200.0300.040Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.032+0.000
Nov 260.032+0.000
Nov 250.032+0.000
Nov 240.032+0.000
Nov 230.032+0.000
Nov 220.032+0.000
Nov 210.032+0.000
Nov 200.032+0.000
Nov 190.032+0.000
Nov 180.032+0.000
Nov 170.032+0.002
Nov 160.030+0.000
Nov 150.030+0.000
Nov 140.030-0.005
Nov 130.035+0.005
Nov 120.030+0.000
Nov 110.030+0.005
Nov 100.025-0.005
Nov 90.030+0.000
Nov 80.030+0.000
Nov 70.030+0.030
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000-0.032
Oct 310.032+0.000
Oct 300.032+0.000
Oct 290.032—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Oklahoma) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Natural Gas Pipeline (NGPL) · posted 2026-09-22 · effective 2026-09-22 · informational
Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ONEOKFS/NGPL CUS (Natural Gas Pipeline (NGPL) loc 5388) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/5388/