EMP-EOIT/NGPL CORN WASHITA

Natural Gas Pipeline (NGPL) · Loc 5383 · Oklahoma
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
0.073
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.045
Bcf/d
30-day average
0.059
30 of 30 days posted
30-day high
0.085
Nov 4
30-day low
0.021
Nov 24
Operating capacity
0.150
Bcf/d as posted, evening cycle
Utilization
49%
headroom 51%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.073+0.000
Nov 260.073+0.046
Nov 250.027+0.006
Nov 240.021-0.003
Nov 230.024-0.024
Nov 220.048+0.000
Nov 210.048-0.037
Nov 200.085-0.000
Nov 190.085+0.002
Nov 180.083+0.029
Nov 170.054-0.020
Nov 160.074+0.000
Nov 150.074+0.000
Nov 140.074+0.043
Nov 130.031-0.037
Nov 120.068+0.000
Nov 110.067-0.015
Nov 100.082+0.035
Nov 90.047+0.000
Nov 80.047+0.000
Nov 70.047-0.017
Nov 60.064+0.007
Nov 50.058-0.028
Nov 40.085+0.050
Nov 30.035-0.047
Nov 20.082+0.000
Nov 10.082+0.037
Oct 310.045+0.000
Oct 300.045+0.016
Oct 290.029—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Oklahoma) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Natural Gas Pipeline (NGPL) · posted 2026-09-22 · effective 2026-09-22 · informational
Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, EMP-EOIT/NGPL CORN WASHITA (Natural Gas Pipeline (NGPL) loc 5383) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/5383/