Gas day Nov 27
-0.034
Bcf/d scheduled
Δ Day-over-day
+0.042
vs Nov 26
7-day average
-0.046
Bcf/d
30-day average
-0.046
30 of 30 days posted
30-day high
-0.000
Nov 15
30-day low
-0.166
Nov 11
Operating capacity
0.425
Bcf/d as posted, evening cycle
Utilization
8%
headroom 92%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.20-0.15-0.10-0.05-0.00Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.034+0.042
Nov 26-0.076-0.004
Nov 25-0.072-0.007
Nov 24-0.065-0.029
Nov 23-0.035-0.035
Nov 22-0.001+0.043
Nov 21-0.044+0.030
Nov 20-0.074-0.004
Nov 19-0.070-0.031
Nov 18-0.039+0.077
Nov 17-0.116-0.089
Nov 16-0.027-0.027
Nov 15-0.000+0.002
Nov 14-0.002+0.120
Nov 13-0.122-0.043
Nov 12-0.079+0.087
Nov 11-0.166-0.087
Nov 10-0.079-0.014
Nov 9-0.065-0.044
Nov 8-0.020-0.000
Nov 7-0.020+0.012
Nov 6-0.032-0.032
Nov 5-0.000+0.012
Nov 4-0.012-0.012
Nov 3-0.000+0.000
Nov 2-0.000+0.000
Nov 1-0.000+0.000
Oct 31-0.000+0.029
Oct 30-0.029+0.059
Oct 29-0.088—
86 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…