TERR RES/NGPL STATE PARK #A-1 LOVE

Natural Gas Pipeline (NGPL) · Loc 44656 · Oklahoma
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.001
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.001
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.001
Nov 26
30-day low
0.001
Nov 26
Operating capacity
0.006
Bcf/d as posted, evening cycle
Utilization
8%
headroom 92%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0000.0000.001Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.001+0.000
Nov 250.001+0.000
Nov 240.001+0.000
Nov 230.001+0.000
Nov 220.001+0.000
Nov 210.001+0.000
Nov 200.001+0.000
Nov 190.001+0.000
Nov 180.001+0.000
Nov 170.001+0.000
Nov 160.001+0.000
Nov 150.001+0.000
Nov 140.001+0.000
Nov 130.001+0.000
Nov 120.001+0.000
Nov 110.001+0.000
Nov 100.001+0.000
Nov 90.001+0.000
Nov 80.001+0.000
Nov 70.001+0.000
Nov 60.001+0.000
Nov 50.001+0.000
Nov 40.001+0.000
Nov 30.001+0.000
Nov 20.001+0.000
Nov 10.001+0.000
Oct 310.001+0.000
Oct 300.001+0.000
Oct 290.001+0.000
Oct 280.001—
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Oklahoma) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TERR RES/NGPL STATE PARK #A-1 LOVE (Natural Gas Pipeline (NGPL) loc 44656) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/44656/