Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

ATMOS-TX/NGPL AT PARIS LAMAR

Natural Gas Pipeline (NGPL) · Loc 41796 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.032
Bcf/d scheduled
Δ Day-over-day
+0.012
vs Nov 25
7-day average
0.101
Bcf/d
30-day average
0.089
30 of 30 days posted
30-day high
0.214
Nov 17
30-day low
0.000
Oct 30
Operating capacity
0.250
Bcf/d as posted, evening cycle
Utilization
13%
headroom 87%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.032+0.012
Nov 250.020+0.000
Nov 240.020-0.127
Nov 230.147-0.006
Nov 220.153-0.004
Nov 210.157-0.019
Nov 200.176-0.002
Nov 190.178-0.020
Nov 180.198-0.016
Nov 170.214+0.137
Nov 160.077-0.001
Nov 150.078+0.000
Nov 140.078-0.010
Nov 130.088+0.023
Nov 120.065-0.000
Nov 110.065+0.004
Nov 100.061+0.004
Nov 90.057-0.020
Nov 80.077-0.010
Nov 70.087+0.035
Nov 60.052-0.056
Nov 50.108+0.016
Nov 40.092+0.005
Nov 30.087-0.015
Nov 20.102+0.000
Nov 10.102+0.077
Oct 310.025+0.025
Oct 300.000-0.041
Oct 290.041-0.002
Oct 280.043—
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ATMOS-TX/NGPL AT PARIS LAMAR (Natural Gas Pipeline (NGPL) loc 41796) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/41796/