ETP/NGPL BECKVILLE PANOLA

Natural Gas Pipeline (NGPL) · Loc 3352 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
0.121
Bcf/d scheduled
Δ Day-over-day
+0.035
vs Nov 26
7-day average
0.134
Bcf/d
30-day average
0.165
30 of 30 days posted
30-day high
0.267
Nov 14
30-day low
0.075
Nov 17
Operating capacity
0.300
Bcf/d as posted, evening cycle
Utilization
40%
headroom 60%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.121+0.035
Nov 260.086-0.025
Nov 250.112+0.027
Nov 240.085-0.087
Nov 230.172-0.021
Nov 220.193+0.021
Nov 210.172-0.009
Nov 200.180+0.097
Nov 190.083+0.000
Nov 180.083+0.008
Nov 170.075-0.151
Nov 160.227+0.002
Nov 150.225-0.042
Nov 140.267+0.020
Nov 130.247+0.054
Nov 120.194-0.004
Nov 110.198+0.058
Nov 100.140-0.109
Nov 90.249+0.030
Nov 80.219-0.005
Nov 70.224+0.086
Nov 60.138-0.075
Nov 50.213+0.105
Nov 40.108-0.062
Nov 30.171+0.037
Nov 20.134+0.020
Nov 10.114-0.053
Oct 310.166-0.028
Oct 300.194+0.042
Oct 290.152—
86 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Natural Gas Pipeline (NGPL) · posted 2026-10-07 · effective 2026-10-07 · informational
Natural Gas Pipeline (NGPL) · posted 2026-09-23 · effective 2026-09-23 · informational
Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ETP/NGPL BECKVILLE PANOLA (Natural Gas Pipeline (NGPL) loc 3352) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/3352/