ONEOKWES/NGPL PO

Natural Gas Pipeline (NGPL) · Loc 11442 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
-0.041
Bcf/d scheduled
Δ Day-over-day
+0.018
vs Nov 25
7-day average
-0.042
Bcf/d
30-day average
-0.036
30 of 30 days posted
30-day high
-0.026
Nov 21
30-day low
-0.059
Nov 25
Operating capacity
0.102
Bcf/d as posted, evening cycle
Utilization
40%
headroom 60%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.060-0.040-0.0200.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.041+0.018
Nov 25-0.059-0.012
Nov 24-0.047-0.005
Nov 23-0.043+0.000
Nov 22-0.043-0.017
Nov 21-0.026+0.012
Nov 20-0.038+0.000
Nov 19-0.038+0.021
Nov 18-0.059-0.022
Nov 17-0.037+0.006
Nov 16-0.043-0.010
Nov 15-0.033+0.000
Nov 14-0.033-0.007
Nov 13-0.026+0.000
Nov 12-0.026+0.000
Nov 11-0.026+0.002
Nov 10-0.028+0.004
Nov 9-0.033+0.010
Nov 8-0.042+0.000
Nov 7-0.043+0.005
Nov 6-0.048-0.017
Nov 5-0.030-0.004
Nov 4-0.026+0.002
Nov 3-0.028-0.002
Nov 2-0.026+0.005
Nov 1-0.031+0.001
Oct 31-0.033+0.000
Oct 30-0.033-0.002
Oct 29-0.030+0.010
Oct 28-0.040—
84 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ONEOKWES/NGPL PO (Natural Gas Pipeline (NGPL) loc 11442) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/11442/