Gas day Nov 27
0.103
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.047
Bcf/d
30-day average
0.011
30 of 30 days posted
30-day high
0.103
Nov 27
30-day low
0.000
Nov 16
Operating capacity
0.480
Bcf/d as posted, timely cycle
Utilization
22%
headroom 78%
Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.103 | +0.000 |
| Nov 26 | 0.103 | +0.089 |
| Nov 25 | 0.015 | +0.000 |
| Nov 24 | 0.015 | +0.004 |
| Nov 23 | 0.010 | -0.060 |
| Nov 22 | 0.070 | +0.060 |
| Nov 21 | 0.010 | +0.010 |
| Nov 20 | 0.001 | +0.000 |
| Nov 19 | 0.001 | +0.000 |
| Nov 18 | 0.001 | +0.000 |
| Nov 17 | 0.000 | +0.000 |
| Nov 16 | 0.000 | -0.001 |
| Nov 15 | 0.001 | +0.000 |
| Nov 14 | 0.001 | +0.000 |
| Nov 13 | 0.001 | +0.000 |
| Nov 12 | 0.000 | +0.000 |
| Nov 11 | 0.000 | +0.000 |
| Nov 10 | 0.000 | +0.000 |
| Nov 9 | 0.000 | +0.000 |
| Nov 8 | 0.000 | +0.000 |
| Nov 7 | 0.000 | +0.000 |
| Nov 6 | 0.000 | -0.000 |
| Nov 5 | 0.001 | +0.000 |
| Nov 4 | 0.001 | +0.000 |
| Nov 3 | 0.001 | -0.007 |
| Nov 2 | 0.007 | +0.007 |
| Nov 1 | 0.001 | +0.000 |
| Oct 31 | 0.000 | +0.000 |
| Oct 30 | 0.000 | +0.000 |
| Oct 29 | 0.000 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
ANR PipelinePlaced at the center of Porter, IN — approximate; the exact meter site is not published.
Notices
Recent notices on ANR Pipeline (TC Energy)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →
ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other LDC Citygate meters on ANR Pipeline (TC Energy)
- WISCONSIN 0.849 Bcf/d
- CROWN POINT/NIPSCO 0.303 Bcf/d
- MILWAUKEE LATERAL 0.237 Bcf/d
- KALKASKA (MICHCON) 0.194 Bcf/d
- LEBANON/DERBY - VECTREN 0.035 Bcf/d
- MILWAUKEE 0.028 Bcf/d
- SOUTH CHRISNEY (SIGECO) 0.026 Bcf/d
- STAG LAKE(ST JOSEPH CO) 0.025 Bcf/d
Cite thisEnercast PipeScrape, WHEELER (ANR Pipeline (TC Energy) loc 523099) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/anr/523099/