Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

SOUTH CHRISNEY (SIGECO)

ANR Pipeline (TC Energy) · Loc 138747 · SPENCER, Indiana
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.026
Bcf/d scheduled
Δ Day-over-day
-0.002
vs Nov 25
7-day average
0.027
Bcf/d
30-day average
0.025
30 of 30 days posted
30-day high
0.028
Nov 25
30-day low
0.023
Nov 6
Operating capacity
0.086
Bcf/d as posted, timely cycle
Utilization
31%
headroom 69%

Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.026-0.002
Nov 250.028+0.001
Nov 240.028+0.000
Nov 230.028+0.002
Nov 220.025+0.001
Nov 210.024-0.002
Nov 200.026-0.000
Nov 190.026+0.000
Nov 180.026+0.000
Nov 170.026+0.000
Nov 160.026+0.001
Nov 150.025+0.000
Nov 140.025-0.001
Nov 130.026+0.000
Nov 120.026+0.001
Nov 110.024+0.000
Nov 100.024-0.000
Nov 90.025+0.001
Nov 80.023+0.000
Nov 70.023+0.000
Nov 60.023-0.002
Nov 50.025+0.001
Nov 40.024-0.001
Nov 30.024-0.002
Nov 20.026+0.001
Nov 10.025+0.001
Oct 310.024-0.001
Oct 300.025-0.000
Oct 290.025-0.000
Oct 280.025—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
ANR PipelineSOUTH CHRISNEY (SIGECO)

ANR PipelinePlaced at the center of Spencer, IN — approximate; the exact meter site is not published.

Recent notices on ANR Pipeline (TC Energy)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →

ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SOUTH CHRISNEY (SIGECO) (ANR Pipeline (TC Energy) loc 138747) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/138747/