Gas day Nov 26
0.807
Bcf/d scheduled
Δ Day-over-day
-0.267
vs Nov 25
7-day average
0.857
Bcf/d
30-day average
0.812
30 of 30 days posted
30-day high
1.263
Nov 24
30-day low
0.329
Oct 31
Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.807 | -0.267 |
| Nov 25 | 1.074 | -0.189 |
| Nov 24 | 1.263 | +0.219 |
| Nov 23 | 1.044 | +0.328 |
| Nov 22 | 0.717 | +0.205 |
| Nov 21 | 0.512 | -0.066 |
| Nov 20 | 0.578 | -0.204 |
| Nov 19 | 0.782 | +0.004 |
| Nov 18 | 0.779 | -0.205 |
| Nov 17 | 0.983 | -0.076 |
| Nov 16 | 1.059 | -0.028 |
| Nov 15 | 1.087 | -0.008 |
| Nov 14 | 1.095 | -0.153 |
| Nov 13 | 1.248 | +0.071 |
| Nov 12 | 1.176 | +0.120 |
| Nov 11 | 1.056 | +0.145 |
| Nov 10 | 0.911 | +0.089 |
| Nov 9 | 0.822 | +0.012 |
| Nov 8 | 0.810 | -0.036 |
| Nov 7 | 0.846 | -0.101 |
| Nov 6 | 0.947 | +0.178 |
| Nov 5 | 0.769 | +0.121 |
| Nov 4 | 0.648 | +0.056 |
| Nov 3 | 0.592 | -0.002 |
| Nov 2 | 0.594 | -0.031 |
| Nov 1 | 0.625 | +0.296 |
| Oct 31 | 0.329 | -0.039 |
| Oct 30 | 0.368 | -0.070 |
| Oct 29 | 0.438 | +0.048 |
| Oct 28 | 0.391 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
ANR PipelinePlaced at the center of Wood, WI — approximate; the exact meter site is not published.
Notices
Recent notices on ANR Pipeline (TC Energy)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →
ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other LDC Citygate meters on ANR Pipeline (TC Energy)
- CROWN POINT/NIPSCO 0.297 Bcf/d
- MILWAUKEE LATERAL 0.236 Bcf/d
- KALKASKA (MICHCON) 0.194 Bcf/d
- WHEELER 0.103 Bcf/d
- LEBANON/DERBY - VECTREN 0.035 Bcf/d
- MILWAUKEE 0.028 Bcf/d
- SOUTH CHRISNEY (SIGECO) 0.026 Bcf/d
- STAG LAKE(ST JOSEPH CO) 0.025 Bcf/d
Cite thisEnercast PipeScrape, WISCONSIN (ANR Pipeline (TC Energy) loc 261194) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/261194/