Gas day Nov 26
0.035
Bcf/d scheduled
Δ Day-over-day
+0.004
vs Nov 25
7-day average
0.028
Bcf/d
30-day average
0.023
30 of 30 days posted
30-day high
0.037
Nov 24
30-day low
0.012
Oct 31
Operating capacity
0.214
Bcf/d as posted, timely cycle
Utilization
17%
headroom 83%
Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.035 | +0.004 |
| Nov 25 | 0.032 | -0.005 |
| Nov 24 | 0.037 | +0.007 |
| Nov 23 | 0.030 | +0.007 |
| Nov 22 | 0.023 | +0.001 |
| Nov 21 | 0.022 | +0.007 |
| Nov 20 | 0.015 | -0.003 |
| Nov 19 | 0.019 | -0.003 |
| Nov 18 | 0.021 | -0.004 |
| Nov 17 | 0.026 | -0.001 |
| Nov 16 | 0.027 | -0.003 |
| Nov 15 | 0.030 | +0.000 |
| Nov 14 | 0.030 | -0.006 |
| Nov 13 | 0.036 | +0.005 |
| Nov 12 | 0.031 | +0.004 |
| Nov 11 | 0.027 | +0.009 |
| Nov 10 | 0.018 | -0.008 |
| Nov 9 | 0.026 | +0.001 |
| Nov 8 | 0.025 | -0.004 |
| Nov 7 | 0.029 | +0.002 |
| Nov 6 | 0.027 | +0.010 |
| Nov 5 | 0.017 | -0.001 |
| Nov 4 | 0.017 | +0.003 |
| Nov 3 | 0.014 | +0.001 |
| Nov 2 | 0.013 | +0.001 |
| Nov 1 | 0.013 | +0.000 |
| Oct 31 | 0.012 | -0.001 |
| Oct 30 | 0.013 | -0.001 |
| Oct 29 | 0.014 | +0.001 |
| Oct 28 | 0.013 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
ANR PipelinePlaced at the center of Montgomery, OH — approximate; the exact meter site is not published.
Notices
Recent notices on ANR Pipeline (TC Energy)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →
ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other LDC Citygate meters on ANR Pipeline (TC Energy)
- WISCONSIN 0.807 Bcf/d
- CROWN POINT/NIPSCO 0.297 Bcf/d
- MILWAUKEE LATERAL 0.236 Bcf/d
- KALKASKA (MICHCON) 0.194 Bcf/d
- WHEELER 0.103 Bcf/d
- MILWAUKEE 0.028 Bcf/d
- SOUTH CHRISNEY (SIGECO) 0.026 Bcf/d
- STAG LAKE(ST JOSEPH CO) 0.025 Bcf/d
Cite thisEnercast PipeScrape, LEBANON/DERBY - VECTREN (ANR Pipeline (TC Energy) loc 295956) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/295956/