Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

CROWN POINT/NIPSCO

ANR Pipeline (TC Energy) · Loc 138744 · LAKE, Indiana
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.297
Bcf/d scheduled
Δ Day-over-day
-0.028
vs Nov 25
7-day average
0.292
Bcf/d
30-day average
0.215
30 of 30 days posted
30-day high
0.326
Nov 25
30-day low
0.108
Oct 28
Operating capacity
0.354
Bcf/d as posted, timely cycle
Utilization
84%
headroom 16%

Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.100.200.300.40Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.297-0.028
Nov 250.326+0.027
Nov 240.299+0.005
Nov 230.294+0.011
Nov 220.283+0.001
Nov 210.282+0.018
Nov 200.264-0.035
Nov 190.299+0.052
Nov 180.247+0.075
Nov 170.173-0.079
Nov 160.252+0.004
Nov 150.248+0.001
Nov 140.247+0.030
Nov 130.218-0.007
Nov 120.225-0.000
Nov 110.225+0.057
Nov 100.168-0.033
Nov 90.201-0.002
Nov 80.202+0.001
Nov 70.201-0.017
Nov 60.218+0.059
Nov 50.159+0.032
Nov 40.126-0.026
Nov 30.152-0.021
Nov 20.174+0.020
Nov 10.153+0.014
Oct 310.140+0.002
Oct 300.138+0.006
Oct 290.132+0.024
Oct 280.108—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
ANR PipelineCROWN POINT/NIPSCO

ANR PipelinePlaced at the center of Lake, IN — approximate; the exact meter site is not published.

Recent notices on ANR Pipeline (TC Energy)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →

ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CROWN POINT/NIPSCO (ANR Pipeline (TC Energy) loc 138744) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/138744/