Gas day Nov 27
0.237
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 26
7-day average
0.247
Bcf/d
30-day average
0.272
30 of 30 days posted
30-day high
0.359
Nov 17
30-day low
0.175
Nov 1
Operating capacity
0.500
Bcf/d as posted, timely cycle
Utilization
47%
headroom 53%
Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.237 | +0.001 |
| Nov 26 | 0.236 | +0.018 |
| Nov 25 | 0.218 | -0.045 |
| Nov 24 | 0.263 | +0.003 |
| Nov 23 | 0.260 | -0.036 |
| Nov 22 | 0.295 | +0.077 |
| Nov 21 | 0.218 | -0.091 |
| Nov 20 | 0.309 | -0.016 |
| Nov 19 | 0.325 | -0.020 |
| Nov 18 | 0.345 | -0.014 |
| Nov 17 | 0.359 | +0.017 |
| Nov 16 | 0.342 | +0.013 |
| Nov 15 | 0.329 | +0.002 |
| Nov 14 | 0.327 | -0.018 |
| Nov 13 | 0.345 | -0.001 |
| Nov 12 | 0.347 | +0.007 |
| Nov 11 | 0.340 | +0.007 |
| Nov 10 | 0.333 | +0.004 |
| Nov 9 | 0.329 | +0.009 |
| Nov 8 | 0.321 | -0.001 |
| Nov 7 | 0.321 | +0.111 |
| Nov 6 | 0.210 | +0.001 |
| Nov 5 | 0.210 | +0.007 |
| Nov 4 | 0.203 | +0.006 |
| Nov 3 | 0.197 | +0.014 |
| Nov 2 | 0.183 | +0.008 |
| Nov 1 | 0.175 | -0.001 |
| Oct 31 | 0.176 | -0.007 |
| Oct 30 | 0.183 | -0.022 |
| Oct 29 | 0.205 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
ANR PipelinePlaced at the center of Sheboygan, WI — approximate; the exact meter site is not published.
Notices
Recent notices on ANR Pipeline (TC Energy)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →
ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other LDC Citygate meters on ANR Pipeline (TC Energy)
- WISCONSIN 0.849 Bcf/d
- CROWN POINT/NIPSCO 0.303 Bcf/d
- KALKASKA (MICHCON) 0.194 Bcf/d
- WHEELER 0.103 Bcf/d
- LEBANON/DERBY - VECTREN 0.035 Bcf/d
- MILWAUKEE 0.028 Bcf/d
- SOUTH CHRISNEY (SIGECO) 0.026 Bcf/d
- STAG LAKE(ST JOSEPH CO) 0.025 Bcf/d
Cite thisEnercast PipeScrape, MILWAUKEE LATERAL (ANR Pipeline (TC Energy) loc 505621) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/anr/505621/