Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

MILWAUKEE

ANR Pipeline (TC Energy) · Loc 28842 · Waukesha, Wisconsin
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.028
Bcf/d scheduled
Δ Day-over-day
-0.004
vs Nov 25
7-day average
0.029
Bcf/d
30-day average
0.025
30 of 30 days posted
30-day high
0.037
Nov 24
30-day low
0.014
Nov 21
Operating capacity
1.047
Bcf/d as posted, timely cycle
Utilization
3%
headroom 97%

Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.028-0.004
Nov 250.032-0.005
Nov 240.037+0.000
Nov 230.036+0.004
Nov 220.033+0.018
Nov 210.014-0.005
Nov 200.019-0.008
Nov 190.028+0.002
Nov 180.026-0.006
Nov 170.032+0.004
Nov 160.028+0.006
Nov 150.022+0.000
Nov 140.022-0.010
Nov 130.032-0.000
Nov 120.033+0.003
Nov 110.029+0.003
Nov 100.026+0.002
Nov 90.025+0.003
Nov 80.022+0.000
Nov 70.022-0.005
Nov 60.026+0.006
Nov 50.021+0.000
Nov 40.020-0.002
Nov 30.023+0.001
Nov 20.022+0.005
Nov 10.018+0.002
Oct 310.015-0.004
Oct 300.019-0.003
Oct 290.021+0.003
Oct 280.018—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
ANR PipelineMILWAUKEE

ANR PipelinePlaced at the center of Waukesha, WI — approximate; the exact meter site is not published.

Recent notices on ANR Pipeline (TC Energy)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →

ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MILWAUKEE (ANR Pipeline (TC Energy) loc 28842) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/28842/