Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

STAG LAKE(ST JOSEPH CO)

ANR Pipeline (TC Energy) · Loc 22992 · ST JOSEPH, Michigan
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.025
Bcf/d scheduled
Δ Day-over-day
-0.004
vs Nov 25
7-day average
0.027
Bcf/d
30-day average
0.024
30 of 30 days posted
30-day high
0.058
Nov 5
30-day low
0.000
Oct 31
Operating capacity
0.225
Bcf/d as posted, timely cycle
Utilization
11%
headroom 89%

Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.025-0.004
Nov 250.029+0.018
Nov 240.011-0.018
Nov 230.029-0.001
Nov 220.030+0.000
Nov 210.030-0.005
Nov 200.035+0.010
Nov 190.025-0.000
Nov 180.025+0.004
Nov 170.021-0.001
Nov 160.022+0.000
Nov 150.022+0.000
Nov 140.022+0.002
Nov 130.019+0.003
Nov 120.016-0.002
Nov 110.018+0.004
Nov 100.013-0.006
Nov 90.020+0.000
Nov 80.020+0.000
Nov 70.020+0.003
Nov 60.017-0.041
Nov 50.058+0.015
Nov 40.043-0.008
Nov 30.051+0.001
Nov 20.050+0.000
Nov 10.050+0.050
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000+0.000
Oct 280.000—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
ANR PipelineSTAG LAKE(ST JOSEPH CO)

ANR PipelinePlaced at the center of St Joseph, MI — approximate; the exact meter site is not published.

Recent notices on ANR Pipeline (TC Energy)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →

ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, STAG LAKE(ST JOSEPH CO) (ANR Pipeline (TC Energy) loc 22992) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/22992/