Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

WAUKESHA

ANR Pipeline (TC Energy) · Loc 28844 · WAUKESHA, Wisconsin
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.014
Bcf/d scheduled
Δ Day-over-day
-0.003
vs Nov 25
7-day average
0.015
Bcf/d
30-day average
0.015
30 of 30 days posted
30-day high
0.019
Nov 24
30-day low
0.009
Oct 31
Operating capacity
1.043
Bcf/d as posted, timely cycle
Utilization
1%
headroom 99%

Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.0150.020Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.014-0.003
Nov 250.017-0.002
Nov 240.019+0.001
Nov 230.019+0.005
Nov 220.014+0.003
Nov 210.011-0.003
Nov 200.013-0.002
Nov 190.016-0.001
Nov 180.017-0.001
Nov 170.018-0.001
Nov 160.019+0.003
Nov 150.015-0.000
Nov 140.015-0.003
Nov 130.019-0.000
Nov 120.019+0.001
Nov 110.018+0.002
Nov 100.016+0.001
Nov 90.015+0.003
Nov 80.012-0.000
Nov 70.013-0.004
Nov 60.016+0.000
Nov 50.016+0.002
Nov 40.015+0.001
Nov 30.014-0.000
Nov 20.014+0.003
Nov 10.011+0.001
Oct 310.009-0.001
Oct 300.011-0.003
Oct 290.013+0.000
Oct 280.013—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
ANR PipelineWAUKESHA

ANR PipelinePlaced at the center of Waukesha, WI — approximate; the exact meter site is not published.

Recent notices on ANR Pipeline (TC Energy)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →

ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WAUKESHA (ANR Pipeline (TC Energy) loc 28844) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/28844/