ANR Pipeline (TC Energy) · Loc 28841 · Waukesha, Wisconsin
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.012
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.012
Bcf/d
30-day average
0.011
30 of 30 days posted
30-day high
0.014
Nov 24
30-day low
0.006
Oct 31
Operating capacity
1.000
Bcf/d as posted, timely cycle
Utilization
1%
headroom 99%

Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.015Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.012-0.001
Nov 250.013-0.001
Nov 240.014+0.001
Nov 230.013+0.002
Nov 220.012+0.002
Nov 210.009+0.000
Nov 200.009-0.002
Nov 190.011-0.000
Nov 180.011-0.001
Nov 170.012-0.001
Nov 160.013+0.001
Nov 150.012+0.001
Nov 140.011-0.001
Nov 130.013-0.001
Nov 120.013+0.001
Nov 110.013+0.001
Nov 100.012+0.000
Nov 90.012+0.000
Nov 80.012+0.001
Nov 70.011+0.003
Nov 60.007-0.004
Nov 50.011+0.004
Nov 40.008-0.003
Nov 30.010+0.000
Nov 20.010+0.001
Nov 10.009+0.003
Oct 310.006-0.002
Oct 300.008-0.000
Oct 290.008-0.002
Oct 280.010—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
ANR PipelineNEW BERLIN

ANR PipelinePlaced at the center of Waukesha, WI — approximate; the exact meter site is not published.

Recent notices on ANR Pipeline (TC Energy)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →

ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NEW BERLIN (ANR Pipeline (TC Energy) loc 28841) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/28841/