Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

GCX/TGP AGUA DULCE GCXE RECEIPT NUE

Tennessee Gas Pipeline (TGP) · Loc 57687 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.000
Bcf/d scheduled
Δ Day-over-day
-0.003
vs Nov 25
7-day average
0.000
Bcf/d
30-day average
0.028
30 of 30 days posted
30-day high
0.105
Nov 7
30-day low
0.000
Nov 26
Operating capacity
0.248
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.000-0.003
Nov 250.003+0.003
Nov 240.000+0.000
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000+0.000
Nov 190.000+0.000
Nov 180.000-0.050
Nov 170.050+0.050
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000-0.015
Nov 130.015-0.058
Nov 120.073+0.021
Nov 110.052-0.003
Nov 100.055-0.040
Nov 90.095-0.010
Nov 80.105-0.000
Nov 70.105+0.092
Nov 60.013-0.032
Nov 50.045+0.015
Nov 40.030+0.013
Nov 30.017+0.017
Nov 20.000+0.000
Nov 10.000-0.050
Oct 310.050+0.000
Oct 300.050+0.035
Oct 290.015-0.041
Oct 280.056—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational