Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

WHISTLEP/TGP WHISTLE RECEIPT NUECES

Tennessee Gas Pipeline (TGP) · Loc 54847 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.493
Bcf/d scheduled
Δ Day-over-day
+0.002
vs Nov 25
7-day average
0.424
Bcf/d
30-day average
0.422
30 of 30 days posted
30-day high
0.493
Nov 26
30-day low
0.311
Oct 29
Operating capacity
0.512
Bcf/d as posted, evening cycle
Utilization
96%
headroom 4%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.60Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.493+0.002
Nov 250.490+0.005
Nov 240.485+0.116
Nov 230.369+0.012
Nov 220.357-0.005
Nov 210.362-0.050
Nov 200.412-0.073
Nov 190.485+0.025
Nov 180.460-0.025
Nov 170.485+0.110
Nov 160.375+0.012
Nov 150.363-0.056
Nov 140.419+0.017
Nov 130.402-0.059
Nov 120.462+0.014
Nov 110.448+0.017
Nov 100.431+0.015
Nov 90.416+0.005
Nov 80.411+0.017
Nov 70.394-0.005
Nov 60.399-0.044
Nov 50.442+0.000
Nov 40.442-0.029
Nov 30.472+0.021
Nov 20.451+0.020
Nov 10.431+0.070
Oct 310.361+0.009
Oct 300.351+0.040
Oct 290.311-0.174
Oct 280.485—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-11-17 · effective 2026-11-18 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-10-27 · effective 2026-10-28 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-09-29 · effective 2026-09-29 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WHISTLEP/TGP WHISTLE RECEIPT NUECES (Tennessee Gas Pipeline (TGP) loc 54847) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/54847/