Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

ET G&P/TGP GANADO PLANT JACKSON

Tennessee Gas Pipeline (TGP) · Loc 412860 · Texas
Processing plant · counted in Supply / Production
Gas day Nov 26
0.493
Bcf/d scheduled
Δ Day-over-day
-0.005
vs Nov 25
7-day average
0.479
Bcf/d
30-day average
0.452
30 of 30 days posted
30-day high
0.505
Nov 21
30-day low
0.354
Oct 28
Operating capacity
0.749
Bcf/d as posted, evening cycle
Utilization
66%
headroom 34%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.60Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.493-0.005
Nov 250.498+0.027
Nov 240.471-0.021
Nov 230.492-0.002
Nov 220.495-0.011
Nov 210.505+0.111
Nov 200.395-0.070
Nov 190.465+0.015
Nov 180.450-0.025
Nov 170.475+0.012
Nov 160.464-0.017
Nov 150.481+0.003
Nov 140.478+0.017
Nov 130.461+0.002
Nov 120.459+0.000
Nov 110.459+0.026
Nov 100.432+0.007
Nov 90.425+0.000
Nov 80.425+0.002
Nov 70.423-0.002
Nov 60.425-0.054
Nov 50.480+0.034
Nov 40.446+0.002
Nov 30.443+0.019
Nov 20.424-0.049
Nov 10.473+0.047
Oct 310.427+0.020
Oct 300.407-0.017
Oct 290.424+0.069
Oct 280.354—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ET G&P/TGP GANADO PLANT JACKSON (Tennessee Gas Pipeline (TGP) loc 412860) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412860/