Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

E OH GAS/TGP HOLMES TUSCARAWAS

Tennessee Gas Pipeline (TGP) · Loc 48850 · Ohio
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.338
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 25
7-day average
0.318
Bcf/d
30-day average
0.311
30 of 30 days posted
30-day high
0.352
Nov 3
30-day low
0.241
Nov 18
Operating capacity
0.497
Bcf/d as posted, evening cycle
Utilization
68%
headroom 32%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.300.40Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.338+0.001
Nov 250.337+0.033
Nov 240.304-0.018
Nov 230.322+0.000
Nov 220.322+0.015
Nov 210.307+0.007
Nov 200.300+0.019
Nov 190.281+0.040
Nov 180.241-0.043
Nov 170.284-0.026
Nov 160.311+0.000
Nov 150.311+0.000
Nov 140.311+0.000
Nov 130.311+0.008
Nov 120.303+0.000
Nov 110.303-0.002
Nov 100.305-0.021
Nov 90.326+0.000
Nov 80.326+0.000
Nov 70.326+0.000
Nov 60.326+0.013
Nov 50.313+0.000
Nov 40.313-0.039
Nov 30.352+0.037
Nov 20.315-0.012
Nov 10.327-0.006
Oct 310.333+0.022
Oct 300.311+0.028
Oct 290.283-0.012
Oct 280.295—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-10-29 · effective 2026-10-29 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, E OH GAS/TGP HOLMES TUSCARAWAS (Tennessee Gas Pipeline (TGP) loc 48850) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/48850/