APPLACHA/TGP UDP LIBERTY DEHY: RIP

Tennessee Gas Pipeline (TGP) · Loc 412850 · Pennsylvania
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.878
Bcf/d scheduled
Δ Day-over-day
+0.015
vs Nov 25
7-day average
0.828
Bcf/d
30-day average
0.837
30 of 30 days posted
30-day high
0.990
Oct 31
30-day low
0.713
Nov 23
Operating capacity
1.025
Bcf/d as posted, evening cycle
Utilization
86%
headroom 14%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.250.500.751.00Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.878+0.015
Nov 250.862-0.003
Nov 240.866+0.153
Nov 230.713-0.076
Nov 220.789-0.038
Nov 210.827-0.035
Nov 200.862-0.046
Nov 190.908+0.002
Nov 180.906+0.021
Nov 170.885+0.036
Nov 160.849+0.052
Nov 150.797-0.013
Nov 140.809-0.029
Nov 130.838+0.023
Nov 120.815-0.010
Nov 110.825-0.006
Nov 100.830+0.034
Nov 90.796+0.024
Nov 80.772-0.042
Nov 70.814+0.053
Nov 60.760+0.005
Nov 50.755-0.058
Nov 40.813+0.014
Nov 30.800-0.021
Nov 20.821+0.017
Nov 10.804-0.186
Oct 310.990+0.107
Oct 300.883-0.035
Oct 290.918-0.015
Oct 280.933—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, APPLACHA/TGP UDP LIBERTY DEHY: RIP (Tennessee Gas Pipeline (TGP) loc 412850) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412850/