Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

APPLACHA/TGP UDP SHOEMAKER DEHY: RI

Tennessee Gas Pipeline (TGP) · Loc 412846 · Pennsylvania
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.554
Bcf/d scheduled
Δ Day-over-day
-0.002
vs Nov 26
7-day average
0.554
Bcf/d
30-day average
0.561
30 of 30 days posted
30-day high
0.592
Nov 3
30-day low
0.539
Nov 25
Operating capacity
0.543
Bcf/d as posted, evening cycle
Utilization
102%
headroom 0%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.60Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.554-0.002
Nov 260.556+0.017
Nov 250.539-0.022
Nov 240.560+0.001
Nov 230.559+0.007
Nov 220.552-0.007
Nov 210.559+0.000
Nov 200.559+0.010
Nov 190.549+0.001
Nov 180.548-0.032
Nov 170.579+0.005
Nov 160.574+0.001
Nov 150.574+0.000
Nov 140.573-0.006
Nov 130.579+0.040
Nov 120.539-0.004
Nov 110.543+0.003
Nov 100.539+0.000
Nov 90.539-0.000
Nov 80.539+0.000
Nov 70.539-0.020
Nov 60.559-0.008
Nov 50.567+0.002
Nov 40.566-0.027
Nov 30.592+0.013
Nov 20.580-0.013
Nov 10.592+0.022
Oct 310.570+0.008
Oct 300.561-0.012
Oct 290.573—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, APPLACHA/TGP UDP SHOEMAKER DEHY: RI (Tennessee Gas Pipeline (TGP) loc 412846) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/412846/