MATTEXPR/TGP BERNARD CREEK RECEIPT

Tennessee Gas Pipeline (TGP) · Loc 56009 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
0.408
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.469
Bcf/d
30-day average
0.465
30 of 30 days posted
30-day high
0.626
Nov 14
30-day low
0.357
Nov 3
Operating capacity
0.757
Bcf/d as posted, evening cycle
Utilization
54%
headroom 46%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.600.80Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.408+0.000
Nov 260.408-0.048
Nov 250.456-0.051
Nov 240.507+0.009
Nov 230.498-0.013
Nov 220.512+0.017
Nov 210.495+0.018
Nov 200.476+0.078
Nov 190.398-0.025
Nov 180.423-0.005
Nov 170.427-0.135
Nov 160.563-0.021
Nov 150.583-0.042
Nov 140.626+0.096
Nov 130.529+0.071
Nov 120.459-0.016
Nov 110.475+0.060
Nov 100.415+0.002
Nov 90.412-0.021
Nov 80.433+0.011
Nov 70.422+0.011
Nov 60.411-0.036
Nov 50.446+0.024
Nov 40.422+0.066
Nov 30.357-0.014
Nov 20.370-0.047
Nov 10.417-0.100
Oct 310.518+0.014
Oct 300.503-0.087
Oct 290.590—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MATTEXPR/TGP BERNARD CREEK RECEIPT (Tennessee Gas Pipeline (TGP) loc 56009) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/56009/