Gas day Nov 27
0.106
Bcf/d scheduled
Δ Day-over-day
+0.025
vs Nov 26
7-day average
0.133
Bcf/d
30-day average
0.100
30 of 30 days posted
30-day high
0.198
Nov 21
30-day low
0.042
Nov 13
Operating capacity
0.256
Bcf/d as posted, evening cycle
Utilization
42%
headroom 58%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.106+0.025
Nov 260.082-0.027
Nov 250.108+0.023
Nov 240.086-0.093
Nov 230.178+0.005
Nov 220.174-0.025
Nov 210.198+0.097
Nov 200.101+0.013
Nov 190.088-0.016
Nov 180.104+0.009
Nov 170.095-0.074
Nov 160.169+0.000
Nov 150.169+0.000
Nov 140.169+0.127
Nov 130.042-0.010
Nov 120.052-0.013
Nov 110.065-0.032
Nov 100.096+0.050
Nov 90.046+0.000
Nov 80.046+0.000
Nov 70.046-0.040
Nov 60.087+0.018
Nov 50.069-0.046
Nov 40.115+0.030
Nov 30.085-0.020
Nov 20.105+0.017
Nov 10.089-0.032
Oct 310.121+0.067
Oct 300.054+0.003
Oct 290.051—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, KMTEJAS/TGP EGYPT PHPE RB WHARTON (Tennessee Gas Pipeline (TGP) loc 56689) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/56689/