Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

GREYLOCK/TGP HERTENBERGER RD WEASLE

Tennessee Gas Pipeline (TGP) · Loc 56405 · Pennsylvania
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.117
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.116
Bcf/d
30-day average
0.115
30 of 30 days posted
30-day high
0.119
Nov 19
30-day low
0.101
Nov 20
Operating capacity
0.198
Bcf/d as posted, evening cycle
Utilization
59%
headroom 41%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.117+0.000
Nov 260.117+0.002
Nov 250.115+0.001
Nov 240.114-0.002
Nov 230.116+0.000
Nov 220.116+0.000
Nov 210.116+0.014
Nov 200.101-0.018
Nov 190.119+0.003
Nov 180.116+0.002
Nov 170.114-0.002
Nov 160.116-0.002
Nov 150.118+0.001
Nov 140.117+0.008
Nov 130.109-0.008
Nov 120.118+0.000
Nov 110.118+0.002
Nov 100.116-0.001
Nov 90.117+0.000
Nov 80.117+0.000
Nov 70.117+0.000
Nov 60.117+0.003
Nov 50.114-0.002
Nov 40.116-0.002
Nov 30.118+0.007
Nov 20.111+0.002
Nov 10.109-0.007
Oct 310.116+0.000
Oct 300.116-0.000
Oct 290.116—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, GREYLOCK/TGP HERTENBERGER RD WEASLE (Tennessee Gas Pipeline (TGP) loc 56405) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/56405/