Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

LESRENEW/TGP BEECH HOLLOW BIOGAS BU

Tennessee Gas Pipeline (TGP) · Loc 56392 · Ohio
Processing plant · counted in Supply / Production
Gas day Nov 26
-0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
-0.000
Bcf/d
30-day average
-0.000
30 of 30 days posted
30-day high
-0.000
Nov 26
30-day low
-0.000
Oct 31
Operating capacity
0.000
Bcf/d as posted, evening cycle
Utilization
15%
headroom 85%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.000-0.000-0.000-0.000-0.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.000+0.000
Nov 25-0.000+0.000
Nov 24-0.000+0.000
Nov 23-0.000+0.000
Nov 22-0.000+0.000
Nov 21-0.000+0.000
Nov 20-0.000+0.000
Nov 19-0.000+0.000
Nov 18-0.000+0.000
Nov 17-0.000+0.000
Nov 16-0.000+0.000
Nov 15-0.000+0.000
Nov 14-0.000+0.000
Nov 13-0.000+0.000
Nov 12-0.000+0.000
Nov 11-0.000+0.000
Nov 10-0.000+0.000
Nov 9-0.000+0.000
Nov 8-0.000+0.000
Nov 7-0.000+0.000
Nov 6-0.000+0.000
Nov 5-0.000+0.000
Nov 4-0.000+0.000
Nov 3-0.000+0.000
Nov 2-0.000+0.000
Nov 1-0.000+0.000
Oct 31-0.000+0.000
Oct 30-0.000+0.000
Oct 29-0.000+0.000
Oct 28-0.000—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LESRENEW/TGP BEECH HOLLOW BIOGAS BU (Tennessee Gas Pipeline (TGP) loc 56392) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/56392/