Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

TGP/KMTEJAS KING RANCH EXCH #2 ROLL

Tennessee Gas Pipeline (TGP) · Loc 55152 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.040
Bcf/d scheduled
Δ Day-over-day
-0.014
vs Nov 25
7-day average
0.019
Bcf/d
30-day average
0.018
30 of 30 days posted
30-day high
0.055
Nov 25
30-day low
0.000
Nov 23
Operating capacity
0.169
Bcf/d as posted, evening cycle
Utilization
24%
headroom 76%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.040-0.014
Nov 250.055+0.018
Nov 240.037+0.037
Nov 230.000+0.000
Nov 220.000-0.001
Nov 210.001+0.001
Nov 200.000-0.018
Nov 190.018+0.000
Nov 180.018+0.000
Nov 170.018+0.007
Nov 160.011+0.000
Nov 150.011+0.000
Nov 140.011+0.004
Nov 130.006-0.010
Nov 120.017+0.000
Nov 110.017+0.005
Nov 100.012-0.014
Nov 90.026-0.016
Nov 80.042-0.004
Nov 70.046+0.009
Nov 60.037-0.004
Nov 50.041+0.026
Nov 40.015+0.005
Nov 30.010+0.010
Nov 20.000-0.006
Nov 10.006-0.012
Oct 310.018+0.000
Oct 300.018+0.003
Oct 290.015+0.009
Oct 280.006—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TGP/KMTEJAS KING RANCH EXCH #2 ROLL (Tennessee Gas Pipeline (TGP) loc 55152) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/55152/