Gas day Nov 26
0.169
Bcf/d scheduled
Δ Day-over-day
-0.020
vs Nov 25
7-day average
0.146
Bcf/d
30-day average
0.119
30 of 30 days posted
30-day high
0.189
Nov 25
30-day low
0.048
Oct 28
Operating capacity
0.420
Bcf/d as posted, evening cycle
Utilization
40%
headroom 60%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.169-0.020
Nov 250.189+0.007
Nov 240.182+0.058
Nov 230.124+0.000
Nov 220.124+0.000
Nov 210.123+0.009
Nov 200.115+0.002
Nov 190.112-0.030
Nov 180.142+0.011
Nov 170.131-0.007
Nov 160.137+0.009
Nov 150.129-0.004
Nov 140.133-0.010
Nov 130.143-0.002
Nov 120.145-0.006
Nov 110.151+0.054
Nov 100.098-0.001
Nov 90.099-0.003
Nov 80.101-0.010
Nov 70.112+0.025
Nov 60.087+0.006
Nov 50.081+0.014
Nov 40.067+0.017
Nov 30.050-0.125
Nov 20.175+0.000
Nov 10.175+0.099
Oct 310.076+0.000
Oct 300.076-0.006
Oct 290.082+0.034
Oct 280.048—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-10-29 · effective 2026-10-29 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, E OH GAS/TGP BULLSEYE TUSCARAWAS (Tennessee Gas Pipeline (TGP) loc 54641) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/54641/