Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

UGIAPP/TGP FARMER BROTHERS COLUMBIA

Tennessee Gas Pipeline (TGP) · Loc 53950 · Ohio
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.182
Bcf/d scheduled
Δ Day-over-day
+0.004
vs Nov 26
7-day average
0.189
Bcf/d
30-day average
0.199
30 of 30 days posted
30-day high
0.220
Nov 4
30-day low
0.172
Nov 25
Operating capacity
0.232
Bcf/d as posted, evening cycle
Utilization
79%
headroom 21%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.182+0.004
Nov 260.179+0.006
Nov 250.172-0.037
Nov 240.210+0.010
Nov 230.200+0.009
Nov 220.191+0.000
Nov 210.191-0.005
Nov 200.196+0.008
Nov 190.188-0.003
Nov 180.191+0.000
Nov 170.191-0.026
Nov 160.217+0.020
Nov 150.197+0.000
Nov 140.197-0.011
Nov 130.208-0.009
Nov 120.217+0.013
Nov 110.204-0.012
Nov 100.216+0.001
Nov 90.215+0.009
Nov 80.206+0.000
Nov 70.206-0.001
Nov 60.207+0.008
Nov 50.200-0.021
Nov 40.220+0.024
Nov 30.196-0.005
Nov 20.201+0.013
Nov 10.188-0.005
Oct 310.193+0.002
Oct 300.191+0.004
Oct 290.187—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, UGIAPP/TGP FARMER BROTHERS COLUMBIA (Tennessee Gas Pipeline (TGP) loc 53950) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/53950/