Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

ETC NEPL/TGP DUNKLEBERGER TIOGA

Tennessee Gas Pipeline (TGP) · Loc 49846 · Pennsylvania
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.185
Bcf/d scheduled
Δ Day-over-day
+0.005
vs Nov 25
7-day average
0.198
Bcf/d
30-day average
0.184
30 of 30 days posted
30-day high
0.223
Nov 22
30-day low
0.139
Oct 28
Operating capacity
0.512
Bcf/d as posted, evening cycle
Utilization
36%
headroom 64%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.185+0.005
Nov 250.180-0.016
Nov 240.197-0.006
Nov 230.202-0.020
Nov 220.223+0.015
Nov 210.207+0.019
Nov 200.189-0.022
Nov 190.210+0.025
Nov 180.185+0.010
Nov 170.176-0.029
Nov 160.205-0.008
Nov 150.213-0.004
Nov 140.216+0.029
Nov 130.188+0.024
Nov 120.164+0.005
Nov 110.159-0.015
Nov 100.173+0.006
Nov 90.167+0.000
Nov 80.167+0.000
Nov 70.167+0.010
Nov 60.157-0.021
Nov 50.178+0.025
Nov 40.153-0.023
Nov 30.176-0.025
Nov 20.201-0.015
Nov 10.216+0.053
Oct 310.164-0.030
Oct 300.194+0.021
Oct 290.172+0.033
Oct 280.139—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ETC NEPL/TGP DUNKLEBERGER TIOGA (Tennessee Gas Pipeline (TGP) loc 49846) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/49846/