Gas day Nov 26
-0.125
Bcf/d scheduled
Δ Day-over-day
-0.052
vs Nov 25
7-day average
-0.105
Bcf/d
30-day average
-0.115
30 of 30 days posted
30-day high
-0.050
Nov 10
30-day low
-0.172
Oct 28
Operating capacity
0.220
Bcf/d as posted, evening cycle
Utilization
57%
headroom 43%
Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | -0.125 | -0.052 |
| Nov 25 | -0.073 | -0.001 |
| Nov 24 | -0.072 | +0.025 |
| Nov 23 | -0.097 | +0.025 |
| Nov 22 | -0.122 | +0.000 |
| Nov 21 | -0.122 | +0.000 |
| Nov 20 | -0.122 | -0.050 |
| Nov 19 | -0.072 | +0.000 |
| Nov 18 | -0.072 | +0.025 |
| Nov 17 | -0.097 | +0.071 |
| Nov 16 | -0.168 | -0.046 |
| Nov 15 | -0.122 | +0.000 |
| Nov 14 | -0.122 | -0.050 |
| Nov 13 | -0.072 | +0.050 |
| Nov 12 | -0.122 | +0.000 |
| Nov 11 | -0.122 | -0.072 |
| Nov 10 | -0.050 | +0.075 |
| Nov 9 | -0.125 | +0.000 |
| Nov 8 | -0.125 | +0.000 |
| Nov 7 | -0.125 | +0.000 |
| Nov 6 | -0.125 | -0.010 |
| Nov 5 | -0.115 | -0.030 |
| Nov 4 | -0.085 | +0.060 |
| Nov 3 | -0.145 | -0.021 |
| Nov 2 | -0.123 | -0.024 |
| Nov 1 | -0.100 | +0.049 |
| Oct 31 | -0.149 | +0.005 |
| Oct 30 | -0.154 | +0.000 |
| Oct 29 | -0.154 | +0.018 |
| Oct 28 | -0.172 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on Tennessee Gas Pipeline (TGP)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →
Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Tennessee Gas Pipeline (TGP)
- APPLACHA/TGP UDP LIBERTY DEHY: RIP 0.878 Bcf/d
- APPLACHA/TGP UDP SHOEMAKER DEHY: RI 0.554 Bcf/d
- ET G&P/TGP GANADO PLANT JACKSON 0.493 Bcf/d
- WHISTLEP/TGP WHISTLE RECEIPT NUECES 0.493 Bcf/d
- MATTEXPR/TGP BERNARD CREEK RECEIPT 0.408 Bcf/d
- UTICA EO/TGP KENSINGTON DEHY: RIP 2 0.369 Bcf/d
- APPLACHA/TGP RATTLESNAKE HILL SUSQU 0.361 Bcf/d
- E OH GAS/TGP HOLMES TUSCARAWAS 0.338 Bcf/d
Cite thisEnercast PipeScrape, KMTEJAS/TGP JACKSON (GANADO) (Tennessee Gas Pipeline (TGP) loc 49803) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/49803/