Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

NMP/TGP GILLRINA ROAD NUECES

Tennessee Gas Pipeline (TGP) · Loc 47799 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
-0.222
Bcf/d scheduled
Δ Day-over-day
-0.015
vs Nov 25
7-day average
-0.230
Bcf/d
30-day average
-0.270
30 of 30 days posted
30-day high
-0.095
Nov 1
30-day low
-0.415
Nov 12
Operating capacity
0.512
Bcf/d as posted, evening cycle
Utilization
43%
headroom 57%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.60-0.40-0.20-0.00Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.222-0.015
Nov 25-0.207+0.099
Nov 24-0.306-0.029
Nov 23-0.277-0.128
Nov 22-0.149+0.056
Nov 21-0.205+0.038
Nov 20-0.243+0.132
Nov 19-0.376-0.121
Nov 18-0.255+0.141
Nov 17-0.396-0.139
Nov 16-0.256-0.082
Nov 15-0.174+0.163
Nov 14-0.337+0.014
Nov 13-0.351+0.065
Nov 12-0.415-0.094
Nov 11-0.322+0.041
Nov 10-0.363-0.107
Nov 9-0.256-0.151
Nov 8-0.104+0.033
Nov 7-0.137+0.224
Nov 6-0.361-0.022
Nov 5-0.339-0.096
Nov 4-0.243+0.038
Nov 3-0.281-0.172
Nov 2-0.108-0.013
Nov 1-0.095+0.252
Oct 31-0.347-0.046
Oct 30-0.300+0.010
Oct 29-0.310+0.040
Oct 28-0.350—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-11-17 · effective 2026-11-18 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-10-27 · effective 2026-10-28 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-10-13 · effective 2026-10-14 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NMP/TGP GILLRINA ROAD NUECES (Tennessee Gas Pipeline (TGP) loc 47799) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/47799/