Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

UGIAPP/TGP HICKORY BEND MAHONING

Tennessee Gas Pipeline (TGP) · Loc 412879 · Ohio
Processing plant · counted in Supply / Production
Gas day Nov 26
0.028
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 25
7-day average
0.029
Bcf/d
30-day average
0.029
30 of 30 days posted
30-day high
0.029
Oct 28
30-day low
0.028
Oct 31
Operating capacity
0.459
Bcf/d as posted, evening cycle
Utilization
6%
headroom 94%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.028-0.000
Nov 250.029+0.000
Nov 240.029+0.000
Nov 230.029+0.000
Nov 220.029+0.000
Nov 210.029-0.000
Nov 200.029+0.000
Nov 190.029+0.000
Nov 180.029+0.000
Nov 170.029+0.000
Nov 160.029+0.000
Nov 150.029+0.000
Nov 140.029+0.000
Nov 130.029+0.000
Nov 120.029+0.000
Nov 110.029+0.000
Nov 100.029+0.000
Nov 90.029+0.000
Nov 80.029+0.000
Nov 70.029+0.000
Nov 60.029+0.000
Nov 50.029+0.000
Nov 40.029+0.000
Nov 30.029-0.001
Nov 20.029+0.000
Nov 10.029+0.001
Oct 310.028+0.000
Oct 300.028+0.000
Oct 290.028-0.001
Oct 280.029—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, UGIAPP/TGP HICKORY BEND MAHONING (Tennessee Gas Pipeline (TGP) loc 412879) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412879/