Gas day Nov 26
0.032
Bcf/d scheduled
Δ Day-over-day
+0.029
vs Nov 25
7-day average
0.058
Bcf/d
30-day average
0.038
30 of 30 days posted
30-day high
0.112
Nov 22
30-day low
0.004
Nov 25
Operating capacity
0.249
Bcf/d as posted, evening cycle
Utilization
13%
headroom 87%
Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.032 | +0.029 |
| Nov 25 | 0.004 | -0.022 |
| Nov 24 | 0.026 | -0.077 |
| Nov 23 | 0.103 | -0.009 |
| Nov 22 | 0.112 | +0.014 |
| Nov 21 | 0.098 | +0.064 |
| Nov 20 | 0.034 | +0.014 |
| Nov 19 | 0.020 | -0.022 |
| Nov 18 | 0.042 | +0.016 |
| Nov 17 | 0.026 | -0.025 |
| Nov 16 | 0.051 | +0.008 |
| Nov 15 | 0.044 | +0.000 |
| Nov 14 | 0.044 | +0.037 |
| Nov 13 | 0.007 | -0.024 |
| Nov 12 | 0.031 | +0.001 |
| Nov 11 | 0.030 | +0.015 |
| Nov 10 | 0.015 | -0.012 |
| Nov 9 | 0.027 | +0.010 |
| Nov 8 | 0.017 | +0.001 |
| Nov 7 | 0.017 | +0.001 |
| Nov 6 | 0.016 | -0.015 |
| Nov 5 | 0.031 | -0.004 |
| Nov 4 | 0.036 | +0.011 |
| Nov 3 | 0.025 | -0.016 |
| Nov 2 | 0.041 | +0.019 |
| Nov 1 | 0.022 | -0.031 |
| Oct 31 | 0.053 | +0.013 |
| Oct 30 | 0.040 | +0.015 |
| Oct 29 | 0.025 | -0.037 |
| Oct 28 | 0.062 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on Tennessee Gas Pipeline (TGP)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →
Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Tennessee Gas Pipeline (TGP)
- APPLACHA/TGP UDP LIBERTY DEHY: RIP 0.878 Bcf/d
- APPLACHA/TGP UDP SHOEMAKER DEHY: RI 0.554 Bcf/d
- ET G&P/TGP GANADO PLANT JACKSON 0.493 Bcf/d
- WHISTLEP/TGP WHISTLE RECEIPT NUECES 0.493 Bcf/d
- MATTEXPR/TGP BERNARD CREEK RECEIPT 0.408 Bcf/d
- UTICA EO/TGP KENSINGTON DEHY: RIP 2 0.369 Bcf/d
- APPLACHA/TGP RATTLESNAKE HILL SUSQU 0.361 Bcf/d
- E OH GAS/TGP HOLMES TUSCARAWAS 0.338 Bcf/d
Cite thisEnercast PipeScrape, EFMIDS/TGP BANQUETE PLANT: RIP 1T 1 (Tennessee Gas Pipeline (TGP) loc 412877) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412877/