Gas day Nov 26
0.032
Bcf/d scheduled
Δ Day-over-day
+0.029
vs Nov 25
7-day average
0.058
Bcf/d
30-day average
0.038
30 of 30 days posted
30-day high
0.112
Nov 22
30-day low
0.004
Nov 25
Operating capacity
0.249
Bcf/d as posted, evening cycle
Utilization
13%
headroom 87%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.032+0.029
Nov 250.004-0.022
Nov 240.026-0.077
Nov 230.103-0.009
Nov 220.112+0.014
Nov 210.098+0.064
Nov 200.034+0.014
Nov 190.020-0.022
Nov 180.042+0.016
Nov 170.026-0.025
Nov 160.051+0.008
Nov 150.044+0.000
Nov 140.044+0.037
Nov 130.007-0.024
Nov 120.031+0.001
Nov 110.030+0.015
Nov 100.015-0.012
Nov 90.027+0.010
Nov 80.017+0.001
Nov 70.017+0.001
Nov 60.016-0.015
Nov 50.031-0.004
Nov 40.036+0.011
Nov 30.025-0.016
Nov 20.041+0.019
Nov 10.022-0.031
Oct 310.053+0.013
Oct 300.040+0.015
Oct 290.025-0.037
Oct 280.062—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, EFMIDS/TGP BANQUETE PLANT: RIP 1T 1 (Tennessee Gas Pipeline (TGP) loc 412877) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412877/